 Solar PV projects run on photo-voltaic technology.
 This technology uses solar panels to absorb and convert sunlight into electricity directly.
 The Sakri 50 MW Solar project was the first PV project executed by MEIL.
 It was completed in March 2013 in a record time and marks a milestone in MEIL’s strengths in
the area of renewable energy.
 This signature project located in Sakri, Maharashtra.
 In This Project several components include 4 lakh solar modules, 6000 MTs of structural
erection, 80000 foundations, 96 inverters, 120 LT/HT panels, over 2000 km. of cabling, over a
million interconnections, on 420 acres of undulating and rocky terrain.
 The project client is Mahagenco.