1. NMDC establishing a steel plant with Rs 20,000 crore capital in Nagarnar in Bastar district

2. MEIL has taken up the responsibility of supplying the water needs of this prestigious project

3. MEIL has set up a water supply system on a war footing basis

4. The NMDC pumping station is ready for inauguration

5. MEIL has set up two rows of pipelines of 29km length

6. Pump house for water evacuation from Sabari River at Syria village to to NMDC reservoir.

7. Out of 8 machines in the pump house, 5 machines are for pumping and 3 machines in standby.

8. Reservoir capacity is 5 million cubic meters

9. MEIL to supply 2.6 lakh cubic meters of water per day